• Home
    Home
     
  • Export page as PDF
    Download
    Page PDF
  • Download page and all referenced files
    Download
    Files
  • Investors
     

In this Safety Minute, Head of Construction Chelsea Bumb walks us through a recent example of continuous improvement involving our collection line trenching process.

Chelsea and her team started by identifying issues with the old trenching system. Collection line trenching was physically strenuous work, so they returned to the drawing board to simplify their process. The newly designed prototype eliminates a lot of labor-intensive work, replacing it with more predictable engineering methods that increase safety and efficiency. Our construction team continues brainstorming new improvements, working to make the system better.

Watch the video below, and be sure to subscribe to our YouTube channel so you don’t miss a minute.