• Home
    Home
     
  • Export page as PDF
    Download
    Page PDF
  • Download page and all referenced files
    Download
    Files
  • Investors
     

Today’s Wind View looks down the crane boom at One Energy construction team members sitting on the nacelle, where they will wait to receive the rotor: hub + 3 blades.

The process of installing the rotor is called a “rotor fly.” Once the rotor is upright, the larger red crane will then hoist it to the top of the turbine, where it is connected to the generator. It requires two cranes 🏗️ 🏗️ and our talented construction team 👷 👷‍♀️ to get the rotor in position!